{"$schema":"https://pptx.dev/schema/registry.schema.json","name":"Operational Review","type":"registry:narrative","registry_url":"https://www.pptx.gallery/registry/narratives/operational-review.json","dependencies":[],"opf_version":"1.0","slug":"operational-review","category":"narratives","description":"Logical management arc for reviewing how an operation is running: the situation, the complication that threatens it, the resolution, and the roadmap and action plan that deliver it. Built for operations, program and service reviews where the audience needs a decision and a plan, not a story.","web_url":"https://www.pptx.gallery/narratives/operational-review","opf":[{"name":"default","label":"Default OPF snippet","language":"json","source":"{\n  \"$schema\": \"https://openpresentation.org/schema/opf/v1\",\n  \"name\": \"PPTX.gallery — narratives/operational-review\",\n  \"narrative\": \"operational-review\",\n  \"tags\": [\n    \"gallery:narratives/operational-review\"\n  ],\n  \"slides\": [\n    {\n      \"id\": \"gallery-preview-1\",\n      \"layout\": \"text\",\n      \"title\": \"Narrative preview\",\n      \"subtitle\": \"Storyline scaffolded by the \\\"operational-review\\\" narrative.\"\n    }\n  ],\n  \"catalogs\": {\n    \"default\": {\n      \"source\": \"https://www.pptx.gallery\",\n      \"narratives\": {\n        \"operational-review\": {\n          \"name\": \"Operational Review\",\n          \"summary\": \"Logical management arc for reviewing how an operation is running: the situation, the complication that threatens it, the resolution, and the roadmap and action plan that deliver it. Built for operations, program and service reviews where the audience needs a decision and a plan, not a story.\",\n          \"audienceFit\": [\n            \"leadership\",\n            \"executives\",\n            \"managers\",\n            \"cross-functional-partners\"\n          ],\n          \"duration\": {\n            \"min\": 20,\n            \"max\": 45\n          },\n          \"tags\": [\n            \"management\",\n            \"operations\",\n            \"review\",\n            \"internal\"\n          ],\n          \"beats\": [\n            {\n              \"id\": \"headline\",\n              \"name\": \"Headline\",\n              \"description\": \"Open with the operation under review and the one-sentence conclusion of the whole review, so the audience knows where it is going before the detail starts.\",\n              \"instructions\": \"State the conclusion first\",\n              \"type\": \"text\",\n              \"layout\": \"cover\"\n            },\n            {\n              \"id\": \"situation\",\n              \"name\": \"Situation\",\n              \"description\": \"Describe how the operation runs today with the few metrics that define it: volume, quality, cost, time. Stick to facts the room will agree with.\",\n              \"instructions\": \"Establish the facts\",\n              \"type\": \"metric\",\n              \"layout\": \"metrics\"\n            },\n            {\n              \"id\": \"complication\",\n              \"name\": \"Complication\",\n              \"description\": \"Name what has changed or is at risk: the trend, constraint or failure that makes the current way of running unsustainable. Quantify the cost of doing nothing.\",\n              \"instructions\": \"Show what is at stake\",\n              \"type\": \"chart\",\n              \"layout\": \"chart\"\n            },\n            {\n              \"id\": \"root-causes\",\n              \"name\": \"Root Causes\",\n              \"description\": \"Explain why the complication is happening. Separate causes the team controls from those it does not, and point to the evidence for each.\",\n              \"instructions\": \"Diagnose the cause\",\n              \"type\": \"text\",\n              \"layout\": \"two-column\"\n            },\n            {\n              \"id\": \"resolution\",\n              \"name\": \"Resolution\",\n              \"description\": \"Recommend the change that resolves the complication, with the expected effect on the metrics from the situation slide. One recommendation, stated plainly.\",\n              \"instructions\": \"Recommend the fix\",\n              \"type\": \"text\",\n              \"layout\": \"statement\"\n            },\n            {\n              \"id\": \"roadmap\",\n              \"name\": \"Roadmap\",\n              \"description\": \"Lay out the phases that deliver the resolution, with what each phase changes and the milestone that marks it done.\",\n              \"instructions\": \"Sequence the change\",\n              \"type\": \"timeline\",\n              \"layout\": \"timeline\"\n            },\n            {\n              \"id\": \"action-plan\",\n              \"name\": \"Action Plan\",\n              \"description\": \"List the immediate actions with an owner and a due date for each, plus the risks to watch. This is the slide people will screenshot.\",\n              \"instructions\": \"Assign owners and dates\",\n              \"type\": \"text\",\n              \"layout\": \"list\"\n            },\n            {\n              \"id\": \"decision\",\n              \"name\": \"Decision\",\n              \"description\": \"Close with the decision or support you need from this audience today, and what happens next once you have it.\",\n              \"instructions\": \"Ask for the decision\",\n              \"type\": \"text\",\n              \"layout\": \"closing\"\n            }\n          ]\n        }\n      },\n      \"layouts\": {\n        \"text\": {\n          \"name\": \"Text\",\n          \"summary\": \"Prose. Several blocks sit side by side when short and stack when long.\",\n          \"tags\": [\n            \"Text\"\n          ],\n          \"direction\": \"column\",\n          \"regions\": [\n            {\n              \"name\": \"title\"\n            },\n            {\n              \"name\": \"body\",\n              \"accepts\": [\n                \"text\",\n                \"list\",\n                \"quote\",\n                \"code\",\n                \"group\"\n              ],\n              \"flow\": \"auto\"\n            }\n          ],\n          \"description\": \"Explain one idea in continuous prose. Use paragraphs or flowing blocks for detail that needs to be read in sequence.\",\n          \"preview\": {\n            \"vectorSrc\": \"https://www.pptx.gallery/layout-previews/text.svg\"\n          }\n        }\n      }\n    }\n  }\n}","value":{"$schema":"https://openpresentation.org/schema/opf/v1","name":"PPTX.gallery — narratives/operational-review","narrative":"operational-review","tags":["gallery:narratives/operational-review"],"slides":[{"id":"gallery-preview-1","layout":"text","title":"Narrative preview","subtitle":"Storyline scaffolded by the \"operational-review\" narrative."}],"catalogs":{"default":{"source":"https://www.pptx.gallery","narratives":{"operational-review":{"name":"Operational Review","summary":"Logical management arc for reviewing how an operation is running: the situation, the complication that threatens it, the resolution, and the roadmap and action plan that deliver it. Built for operations, program and service reviews where the audience needs a decision and a plan, not a story.","audienceFit":["leadership","executives","managers","cross-functional-partners"],"duration":{"min":20,"max":45},"tags":["management","operations","review","internal"],"beats":[{"id":"headline","name":"Headline","description":"Open with the operation under review and the one-sentence conclusion of the whole review, so the audience knows where it is going before the detail starts.","instructions":"State the conclusion first","type":"text","layout":"cover"},{"id":"situation","name":"Situation","description":"Describe how the operation runs today with the few metrics that define it: volume, quality, cost, time. Stick to facts the room will agree with.","instructions":"Establish the facts","type":"metric","layout":"metrics"},{"id":"complication","name":"Complication","description":"Name what has changed or is at risk: the trend, constraint or failure that makes the current way of running unsustainable. Quantify the cost of doing nothing.","instructions":"Show what is at stake","type":"chart","layout":"chart"},{"id":"root-causes","name":"Root Causes","description":"Explain why the complication is happening. Separate causes the team controls from those it does not, and point to the evidence for each.","instructions":"Diagnose the cause","type":"text","layout":"two-column"},{"id":"resolution","name":"Resolution","description":"Recommend the change that resolves the complication, with the expected effect on the metrics from the situation slide. One recommendation, stated plainly.","instructions":"Recommend the fix","type":"text","layout":"statement"},{"id":"roadmap","name":"Roadmap","description":"Lay out the phases that deliver the resolution, with what each phase changes and the milestone that marks it done.","instructions":"Sequence the change","type":"timeline","layout":"timeline"},{"id":"action-plan","name":"Action Plan","description":"List the immediate actions with an owner and a due date for each, plus the risks to watch. This is the slide people will screenshot.","instructions":"Assign owners and dates","type":"text","layout":"list"},{"id":"decision","name":"Decision","description":"Close with the decision or support you need from this audience today, and what happens next once you have it.","instructions":"Ask for the decision","type":"text","layout":"closing"}]}},"layouts":{"text":{"name":"Text","summary":"Prose. Several blocks sit side by side when short and stack when long.","tags":["Text"],"direction":"column","regions":[{"name":"title"},{"name":"body","accepts":["text","list","quote","code","group"],"flow":"auto"}],"description":"Explain one idea in continuous prose. Use paragraphs or flowing blocks for detail that needs to be read in sequence.","preview":{"vectorSrc":"https://www.pptx.gallery/layout-previews/text.svg"}}}}}}}],"copy_targets":[{"name":"registry_url","label":"Registry URL","content_type":"text/plain","value":"https://www.pptx.gallery/registry/narratives/operational-review.json"},{"name":"web_url","label":"Gallery URL","content_type":"text/plain","value":"https://www.pptx.gallery/narratives/operational-review"},{"name":"opf:default","label":"Default OPF snippet","content_type":"application/json","value":"{\n  \"$schema\": \"https://openpresentation.org/schema/opf/v1\",\n  \"name\": \"PPTX.gallery — narratives/operational-review\",\n  \"narrative\": \"operational-review\",\n  \"tags\": [\n    \"gallery:narratives/operational-review\"\n  ],\n  \"slides\": [\n    {\n      \"id\": \"gallery-preview-1\",\n      \"layout\": \"text\",\n      \"title\": \"Narrative preview\",\n      \"subtitle\": \"Storyline scaffolded by the \\\"operational-review\\\" narrative.\"\n    }\n  ],\n  \"catalogs\": {\n    \"default\": {\n      \"source\": \"https://www.pptx.gallery\",\n      \"narratives\": {\n        \"operational-review\": {\n          \"name\": \"Operational Review\",\n          \"summary\": \"Logical management arc for reviewing how an operation is running: the situation, the complication that threatens it, the resolution, and the roadmap and action plan that deliver it. Built for operations, program and service reviews where the audience needs a decision and a plan, not a story.\",\n          \"audienceFit\": [\n            \"leadership\",\n            \"executives\",\n            \"managers\",\n            \"cross-functional-partners\"\n          ],\n          \"duration\": {\n            \"min\": 20,\n            \"max\": 45\n          },\n          \"tags\": [\n            \"management\",\n            \"operations\",\n            \"review\",\n            \"internal\"\n          ],\n          \"beats\": [\n            {\n              \"id\": \"headline\",\n              \"name\": \"Headline\",\n              \"description\": \"Open with the operation under review and the one-sentence conclusion of the whole review, so the audience knows where it is going before the detail starts.\",\n              \"instructions\": \"State the conclusion first\",\n              \"type\": \"text\",\n              \"layout\": \"cover\"\n            },\n            {\n              \"id\": \"situation\",\n              \"name\": \"Situation\",\n              \"description\": \"Describe how the operation runs today with the few metrics that define it: volume, quality, cost, time. Stick to facts the room will agree with.\",\n              \"instructions\": \"Establish the facts\",\n              \"type\": \"metric\",\n              \"layout\": \"metrics\"\n            },\n            {\n              \"id\": \"complication\",\n              \"name\": \"Complication\",\n              \"description\": \"Name what has changed or is at risk: the trend, constraint or failure that makes the current way of running unsustainable. Quantify the cost of doing nothing.\",\n              \"instructions\": \"Show what is at stake\",\n              \"type\": \"chart\",\n              \"layout\": \"chart\"\n            },\n            {\n              \"id\": \"root-causes\",\n              \"name\": \"Root Causes\",\n              \"description\": \"Explain why the complication is happening. Separate causes the team controls from those it does not, and point to the evidence for each.\",\n              \"instructions\": \"Diagnose the cause\",\n              \"type\": \"text\",\n              \"layout\": \"two-column\"\n            },\n            {\n              \"id\": \"resolution\",\n              \"name\": \"Resolution\",\n              \"description\": \"Recommend the change that resolves the complication, with the expected effect on the metrics from the situation slide. One recommendation, stated plainly.\",\n              \"instructions\": \"Recommend the fix\",\n              \"type\": \"text\",\n              \"layout\": \"statement\"\n            },\n            {\n              \"id\": \"roadmap\",\n              \"name\": \"Roadmap\",\n              \"description\": \"Lay out the phases that deliver the resolution, with what each phase changes and the milestone that marks it done.\",\n              \"instructions\": \"Sequence the change\",\n              \"type\": \"timeline\",\n              \"layout\": \"timeline\"\n            },\n            {\n              \"id\": \"action-plan\",\n              \"name\": \"Action Plan\",\n              \"description\": \"List the immediate actions with an owner and a due date for each, plus the risks to watch. This is the slide people will screenshot.\",\n              \"instructions\": \"Assign owners and dates\",\n              \"type\": \"text\",\n              \"layout\": \"list\"\n            },\n            {\n              \"id\": \"decision\",\n              \"name\": \"Decision\",\n              \"description\": \"Close with the decision or support you need from this audience today, and what happens next once you have it.\",\n              \"instructions\": \"Ask for the decision\",\n              \"type\": \"text\",\n              \"layout\": \"closing\"\n            }\n          ]\n        }\n      },\n      \"layouts\": {\n        \"text\": {\n          \"name\": \"Text\",\n          \"summary\": \"Prose. Several blocks sit side by side when short and stack when long.\",\n          \"tags\": [\n            \"Text\"\n          ],\n          \"direction\": \"column\",\n          \"regions\": [\n            {\n              \"name\": \"title\"\n            },\n            {\n              \"name\": \"body\",\n              \"accepts\": [\n                \"text\",\n                \"list\",\n                \"quote\",\n                \"code\",\n                \"group\"\n              ],\n              \"flow\": \"auto\"\n            }\n          ],\n          \"description\": \"Explain one idea in continuous prose. Use paragraphs or flowing blocks for detail that needs to be read in sequence.\",\n          \"preview\": {\n            \"vectorSrc\": \"https://www.pptx.gallery/layout-previews/text.svg\"\n          }\n        }\n      }\n    }\n  }\n}"}],"metadata":{"category":"narratives","source_dimension":"narratives","slug":"operational-review","page_url":"https://www.pptx.gallery/narratives/operational-review","api_url":"https://www.pptx.gallery/api/narratives.json","playground_url":"https://www.pptx.dev/inspector?config=narratives:operational-review","opf_schema":{"name":"narrative","url":"https://openpresentation.org/schema/opf-narrative/v1"},"source":{"$schema":"https://openpresentation.org/schema/opf-narrative/v1","name":"Operational Review","summary":"Logical management arc for reviewing how an operation is running: the situation, the complication that threatens it, the resolution, and the roadmap and action plan that deliver it. Built for operations, program and service reviews where the audience needs a decision and a plan, not a story.","audienceFit":["leadership","executives","managers","cross-functional-partners"],"duration":{"min":20,"max":45},"tags":["management","operations","review","internal"],"beats":[{"id":"headline","name":"Headline","description":"Open with the operation under review and the one-sentence conclusion of the whole review, so the audience knows where it is going before the detail starts.","instructions":"State the conclusion first","type":"text","layout":"cover"},{"id":"situation","name":"Situation","description":"Describe how the operation runs today with the few metrics that define it: volume, quality, cost, time. Stick to facts the room will agree with.","instructions":"Establish the facts","type":"metric","layout":"metrics"},{"id":"complication","name":"Complication","description":"Name what has changed or is at risk: the trend, constraint or failure that makes the current way of running unsustainable. Quantify the cost of doing nothing.","instructions":"Show what is at stake","type":"chart","layout":"chart"},{"id":"root-causes","name":"Root Causes","description":"Explain why the complication is happening. Separate causes the team controls from those it does not, and point to the evidence for each.","instructions":"Diagnose the cause","type":"text","layout":"two-column"},{"id":"resolution","name":"Resolution","description":"Recommend the change that resolves the complication, with the expected effect on the metrics from the situation slide. One recommendation, stated plainly.","instructions":"Recommend the fix","type":"text","layout":"statement"},{"id":"roadmap","name":"Roadmap","description":"Lay out the phases that deliver the resolution, with what each phase changes and the milestone that marks it done.","instructions":"Sequence the change","type":"timeline","layout":"timeline"},{"id":"action-plan","name":"Action Plan","description":"List the immediate actions with an owner and a due date for each, plus the risks to watch. This is the slide people will screenshot.","instructions":"Assign owners and dates","type":"text","layout":"list"},{"id":"decision","name":"Decision","description":"Close with the decision or support you need from this audience today, and what happens next once you have it.","instructions":"Ask for the decision","type":"text","layout":"closing"}],"id":"operational-review","description":"Logical management arc for reviewing how an operation is running: the situation, the complication that threatens it, the resolution, and the roadmap and action plan that deliver it. Built for operations, program and service reviews where the audience needs a decision and a plan, not a story."}}}