Story Framework
Status Update
Concise progress-report arc for keeping a stakeholder informed: headline, brief, progress, results, plan, feedback. Optimized for short, repeated updates rather than one-time deep dives.
Beat Diagram
- 1Headlinecover / text
- 2Brieftext / text
- 3Progresstext / text
- 4Resultstext / text
- 5Action Plantext / text
- 6Feedbacktext / text
OPF Config
narratives:status-update{
"$schema": "https://openpresentation.org/schema/opf/v1",
"name": "PPTX.gallery — narratives/status-update",
"narrative": "status-update",
"tags": [
"gallery:narratives/status-update"
],
"slides": [
{
"id": "gallery-preview-1",
"layout": "text",
"title": "Narrative preview",
"subtitle": "Storyline scaffolded by the \"status-update\" narrative."
}
],
"catalogs": {
"default": {
"source": "https://www.pptx.gallery",
"narratives": {
"status-update": {
"name": "Status Update",
"summary": "Concise progress-report arc for keeping a stakeholder informed: headline, brief, progress, results, plan, feedback. Optimized for short, repeated updates rather than one-time deep dives.",
"audienceFit": [
"stakeholders",
"managers",
"customers",
"executives"
],
"duration": {
"min": 5,
"max": 15
},
"tags": [
"reporting",
"operations",
"customer-relationship",
"weekly"
],
"beats": [
{
"id": "headline",
"name": "Headline",
"description": "Open with the single most important sentence the audience needs to know — on track, off track, or shifted. The headline replaces 'how's it going' with a clear answer.",
"layout": "cover",
"instructions": "Title & date",
"type": "text"
},
{
"id": "brief",
"name": "Brief",
"description": "State the objective for the period and what was promised. One slide, three lines. Frames the rest of the update so progress is read against a clear bar.",
"instructions": "Summary/objectives",
"type": "text",
"layout": "text"
},
{
"id": "progress",
"name": "Progress",
"description": "Walk through the actions taken since the last update. Specific, attributable, dated. Avoid effort theater — list outcomes and material moves, not activity for its own sake.",
"instructions": "Explain actions taken",
"type": "text",
"layout": "text"
},
{
"id": "results",
"name": "Results",
"description": "Show the outcomes those actions produced. Metrics, customer signals, decisions made. Keep the comparison crisp — versus plan, versus last period, versus benchmark.",
"instructions": "Show outcomes",
"type": "text",
"layout": "text"
},
{
"id": "action-plan",
"name": "Action Plan",
"description": "Outline the next steps and who owns them. Be specific about the next decision point and what would have to happen to slip the schedule.",
"instructions": "Outline next steps",
"type": "text",
"layout": "text"
},
{
"id": "feedback",
"name": "Feedback",
"description": "Invite the audience to weigh in: where you'd like input, where you need a decision, where help would unblock you. End the update with an open hand, not a closed file.",
"layout": "text",
"instructions": "Ask for response",
"type": "text"
}
]
}
},
"layouts": {
"text": {
"name": "Text",
"summary": "Prose. Several blocks sit side by side when short and stack when long.",
"tags": [
"Text"
],
"direction": "column",
"regions": [
{
"name": "title"
},
{
"name": "body",
"accepts": [
"text",
"list",
"quote",
"code",
"group"
],
"role": "primary",
"flow": "auto"
}
],
"description": "Explain one idea in continuous prose. Use paragraphs or flowing blocks for detail that needs to be read in sequence.",
"preview": {
"vectorSrc": "https://www.pptx.gallery/layout-previews/text.svg"
}
}
}
}
}
}Load this config in the gallery's visual editor, or in the Inspector at pptx.dev.
Pace
5-15 minutes
6 beats, one slide each
Audience Fit
Tags
Beat-by-Beat Guide
Headline
Open with the single most important sentence the audience needs to know — on track, off track, or shifted. The headline replaces 'how's it going' with a clear answer.
Instruction: Title & date
Brief
State the objective for the period and what was promised. One slide, three lines. Frames the rest of the update so progress is read against a clear bar.
Instruction: Summary/objectives
Progress
Walk through the actions taken since the last update. Specific, attributable, dated. Avoid effort theater — list outcomes and material moves, not activity for its own sake.
Instruction: Explain actions taken
Results
Show the outcomes those actions produced. Metrics, customer signals, decisions made. Keep the comparison crisp — versus plan, versus last period, versus benchmark.
Instruction: Show outcomes
Action Plan
Outline the next steps and who owns them. Be specific about the next decision point and what would have to happen to slip the schedule.
Instruction: Outline next steps
Feedback
Invite the audience to weigh in: where you'd like input, where you need a decision, where help would unblock you. End the update with an open hand, not a closed file.
Instruction: Ask for response