Story Framework
Status Update
Concise progress-report arc for keeping a stakeholder informed: headline, brief, progress, results, plan, feedback. Optimized for short, repeated updates rather than one-time deep dives.
Beat Diagram
- 1Headlinetitle / text
- 2Brieftext-1x / text
- 3Progresstext-1x / text
- 4Resultstext-1x / text
- 5Action Plantext-1x / text
- 6Feedbacktitle / text
Use Status Update in your next deck — for free
STORYD writes a presentation around your topic and applies Status Update across every slide. No template hunting, no copy-paste.
Free, no card. Exports to PPTX.
OPF Config
narratives:status-update{
"$schema": "https://openpresentation.org/schema/opf/v1",
"name": "PPTX.gallery — narratives/status-update",
"narrative": "status-update",
"tags": [
"gallery:narratives/status-update"
],
"slides": [
{
"id": "gallery-preview-1",
"layout": "title-slide",
"title": "Narrative preview",
"subtitle": "Storyline scaffolded by the \"status-update\" narrative.",
"design": {
"contentBox": false,
"contentAlignment": "center",
"titleAlignment": "center"
}
}
]
}Preview this config live at pptx.dev/playground, or load it in the gallery visual editor.
Pace
5-15 minutes
6 beats
Audience Fit
Tags
Beat-by-Beat Guide
Headline
Open with the single most important sentence the audience needs to know — on track, off track, or shifted. The headline replaces 'how's it going' with a clear answer.
Instruction: Title & date
Brief
State the objective for the period and what was promised. One slide, three lines. Frames the rest of the update so progress is read against a clear bar.
Instruction: Summary/objectives
Progress
Walk through the actions taken since the last update. Specific, attributable, dated. Avoid effort theater — list outcomes and material moves, not activity for its own sake.
Instruction: Explain actions taken
Results
Show the outcomes those actions produced. Metrics, customer signals, decisions made. Keep the comparison crisp — versus plan, versus last period, versus benchmark.
Instruction: Show outcomes
Action Plan
Outline the next steps and who owns them. Be specific about the next decision point and what would have to happen to slip the schedule.
Instruction: Outline next steps
Feedback
Invite the audience to weigh in: where you'd like input, where you need a decision, where help would unblock you. End the update with an open hand, not a closed file.
Instruction: Ask for response