Status Update

Concise progress-report arc for keeping a stakeholder informed: headline, brief, progress, results, plan, feedback. Optimized for short, repeated updates rather than one-time deep dives.

Beat Diagram

  1. 1Headlinetitle / text
  2. 2Brieftext-1x / text
  3. 3Progresstext-1x / text
  4. 4Resultstext-1x / text
  5. 5Action Plantext-1x / text
  6. 6Feedbacktitle / text

Use Status Update in your next deck — for free

STORYD writes a presentation around your topic and applies Status Update across every slide. No template hunting, no copy-paste.

Build a deck with Status Update →

Free, no card. Exports to PPTX.

OPF Config

narratives:status-update
Open Presentation Format
{
  "$schema": "https://openpresentation.org/schema/opf/v1",
  "name": "PPTX.gallery — narratives/status-update",
  "narrative": "status-update",
  "tags": [
    "gallery:narratives/status-update"
  ],
  "slides": [
    {
      "id": "gallery-preview-1",
      "layout": "title-slide",
      "title": "Narrative preview",
      "subtitle": "Storyline scaffolded by the \"status-update\" narrative.",
      "design": {
        "contentBox": false,
        "contentAlignment": "center",
        "titleAlignment": "center"
      }
    }
  ]
}
Open in OPF PlaygroundOpen in visual editor

Preview this config live at pptx.dev/playground, or load it in the gallery visual editor.

Pace

5-15 minutes

6 beats

Audience Fit

stakeholdersmanagerscustomersexecutives

Tags

reportingoperationscustomer-relationshipweekly

Beat-by-Beat Guide

1

Headline

Open with the single most important sentence the audience needs to know — on track, off track, or shifted. The headline replaces 'how's it going' with a clear answer.

Instruction: Title & date

2

Brief

State the objective for the period and what was promised. One slide, three lines. Frames the rest of the update so progress is read against a clear bar.

Instruction: Summary/objectives

3

Progress

Walk through the actions taken since the last update. Specific, attributable, dated. Avoid effort theater — list outcomes and material moves, not activity for its own sake.

Instruction: Explain actions taken

4

Results

Show the outcomes those actions produced. Metrics, customer signals, decisions made. Keep the comparison crisp — versus plan, versus last period, versus benchmark.

Instruction: Show outcomes

5

Action Plan

Outline the next steps and who owns them. Be specific about the next decision point and what would have to happen to slip the schedule.

Instruction: Outline next steps

6

Feedback

Invite the audience to weigh in: where you'd like input, where you need a decision, where help would unblock you. End the update with an open hand, not a closed file.

Instruction: Ask for response