Story Framework

Operational Review

Logical management arc for reviewing how an operation is running: the situation, the complication that threatens it, the resolution, and the roadmap and action plan that deliver it. Built for operations, program and service reviews where the audience needs a decision and a plan, not a story.

Beat Diagram

  1. 1Headlinecover / text
  2. 2Situationmetrics / metric
  3. 3Complicationchart / chart
  4. 4Root Causestwo-column / text
  5. 5Resolutionstatement / text
  6. 6Roadmaptimeline / timeline
  7. 7Action Planlist / text
  8. 8Decisionclosing / text

OPF Config

narratives:operational-review
OPF JSON
{
  "$schema": "https://openpresentation.org/schema/opf/v1",
  "name": "PPTX.gallery — narratives/operational-review",
  "narrative": "operational-review",
  "tags": [
    "gallery:narratives/operational-review"
  ],
  "slides": [
    {
      "id": "gallery-preview-1",
      "layout": "text",
      "title": "Narrative preview",
      "subtitle": "Storyline scaffolded by the \"operational-review\" narrative."
    }
  ],
  "catalogs": {
    "default": {
      "source": "https://www.pptx.gallery",
      "narratives": {
        "operational-review": {
          "name": "Operational Review",
          "summary": "Logical management arc for reviewing how an operation is running: the situation, the complication that threatens it, the resolution, and the roadmap and action plan that deliver it. Built for operations, program and service reviews where the audience needs a decision and a plan, not a story.",
          "audienceFit": [
            "leadership",
            "executives",
            "managers",
            "cross-functional-partners"
          ],
          "duration": {
            "min": 20,
            "max": 45
          },
          "tags": [
            "management",
            "operations",
            "review",
            "internal"
          ],
          "beats": [
            {
              "id": "headline",
              "name": "Headline",
              "description": "Open with the operation under review and the one-sentence conclusion of the whole review, so the audience knows where it is going before the detail starts.",
              "instructions": "State the conclusion first",
              "type": "text",
              "layout": "cover"
            },
            {
              "id": "situation",
              "name": "Situation",
              "description": "Describe how the operation runs today with the few metrics that define it: volume, quality, cost, time. Stick to facts the room will agree with.",
              "instructions": "Establish the facts",
              "type": "metric",
              "layout": "metrics"
            },
            {
              "id": "complication",
              "name": "Complication",
              "description": "Name what has changed or is at risk: the trend, constraint or failure that makes the current way of running unsustainable. Quantify the cost of doing nothing.",
              "instructions": "Show what is at stake",
              "type": "chart",
              "layout": "chart"
            },
            {
              "id": "root-causes",
              "name": "Root Causes",
              "description": "Explain why the complication is happening. Separate causes the team controls from those it does not, and point to the evidence for each.",
              "instructions": "Diagnose the cause",
              "type": "text",
              "layout": "two-column"
            },
            {
              "id": "resolution",
              "name": "Resolution",
              "description": "Recommend the change that resolves the complication, with the expected effect on the metrics from the situation slide. One recommendation, stated plainly.",
              "instructions": "Recommend the fix",
              "type": "text",
              "layout": "statement"
            },
            {
              "id": "roadmap",
              "name": "Roadmap",
              "description": "Lay out the phases that deliver the resolution, with what each phase changes and the milestone that marks it done.",
              "instructions": "Sequence the change",
              "type": "timeline",
              "layout": "timeline"
            },
            {
              "id": "action-plan",
              "name": "Action Plan",
              "description": "List the immediate actions with an owner and a due date for each, plus the risks to watch. This is the slide people will screenshot.",
              "instructions": "Assign owners and dates",
              "type": "text",
              "layout": "list"
            },
            {
              "id": "decision",
              "name": "Decision",
              "description": "Close with the decision or support you need from this audience today, and what happens next once you have it.",
              "instructions": "Ask for the decision",
              "type": "text",
              "layout": "closing"
            }
          ]
        }
      },
      "layouts": {
        "text": {
          "name": "Text",
          "summary": "Prose. Several blocks sit side by side when short and stack when long.",
          "tags": [
            "Text"
          ],
          "direction": "column",
          "regions": [
            {
              "name": "title"
            },
            {
              "name": "body",
              "accepts": [
                "text",
                "list",
                "quote",
                "code",
                "group"
              ],
              "flow": "auto"
            }
          ],
          "description": "Explain one idea in continuous prose. Use paragraphs or flowing blocks for detail that needs to be read in sequence.",
          "preview": {
            "vectorSrc": "https://www.pptx.gallery/layout-previews/text.svg"
          }
        }
      }
    }
  }
}
Open in visual editorOpen in Inspector

Load this config in the gallery's visual editor, or in the Inspector at pptx.dev.

Pace

20-45 minutes

8 beats, one slide each

Audience Fit

leadershipexecutivesmanagerscross-functional-partners

Tags

managementoperationsreviewinternal

Beat-by-Beat Guide

1

Headline

Open with the operation under review and the one-sentence conclusion of the whole review, so the audience knows where it is going before the detail starts.

Instruction: State the conclusion first

2

Situation

Describe how the operation runs today with the few metrics that define it: volume, quality, cost, time. Stick to facts the room will agree with.

Instruction: Establish the facts

3

Complication

Name what has changed or is at risk: the trend, constraint or failure that makes the current way of running unsustainable. Quantify the cost of doing nothing.

Instruction: Show what is at stake

4

Root Causes

Explain why the complication is happening. Separate causes the team controls from those it does not, and point to the evidence for each.

Instruction: Diagnose the cause

5

Resolution

Recommend the change that resolves the complication, with the expected effect on the metrics from the situation slide. One recommendation, stated plainly.

Instruction: Recommend the fix

6

Roadmap

Lay out the phases that deliver the resolution, with what each phase changes and the milestone that marks it done.

Instruction: Sequence the change

7

Action Plan

List the immediate actions with an owner and a due date for each, plus the risks to watch. This is the slide people will screenshot.

Instruction: Assign owners and dates

8

Decision

Close with the decision or support you need from this audience today, and what happens next once you have it.

Instruction: Ask for the decision