Use a Gantt diagram to show tasks on a calendar with their order and duration, such as the phases of a project plan.

ganttgantt
Discovery runs interviews and synthesis in January; delivery runs design and build from late January to early March, ending with the launch milestone.
The sample below, drawn with the gallery's default theme. Another theme, color scheme or variant redraws the same source in its fonts and colors.

First line

The first word of the source, gantt, names the Mermaid family; the rest follows Mermaid's syntax for it.

Alt text

Discovery runs interviews and synthesis in January; delivery runs design and build from late January to early March, ending with the launch milestone.

Markdown

A mermaid fence is a diagram; alt is its text alternative.
OPF Markdown
# Gantt

```mermaid alt="Discovery runs interviews and synthesis in January; delivery runs design and build from late January to early March, ending with the launch milestone."
gantt
  dateFormat YYYY-MM-DD
  axisFormat %b %d
  tickInterval 2week
  section Discovery
    Interviews :a1, 2027-01-04, 14d
    Synthesis :a2, after a1, 7d
  section Delivery
    Design :b1, after a2, 14d
    Build :b2, after b1, 28d
    Launch :milestone, after b2, 0d
```

Layouts That Take It

Give the slide one of these layouts to place the diagram in a region, or none to compose it automatically.

OPF Config

diagrams:gantt
OPF JSON
{
  "$schema": "https://openpresentation.org/schema/opf/v1",
  "name": "PPTX.gallery — diagrams/gantt",
  "description": "Use a Gantt diagram to show tasks on a calendar with their order and duration, such as the phases of a project plan.",
  "tags": [
    "gallery:diagrams/gantt"
  ],
  "slides": [
    {
      "id": "gallery-preview-1",
      "layout": "chart",
      "title": "Gantt",
      "diagram": {
        "source": "gantt\n  dateFormat YYYY-MM-DD\n  axisFormat %b %d\n  tickInterval 2week\n  section Discovery\n    Interviews :a1, 2027-01-04, 14d\n    Synthesis :a2, after a1, 7d\n  section Delivery\n    Design :b1, after a2, 14d\n    Build :b2, after b1, 28d\n    Launch :milestone, after b2, 0d",
        "alt": "Discovery runs interviews and synthesis in January; delivery runs design and build from late January to early March, ending with the launch milestone."
      }
    }
  ],
  "catalogs": {
    "default": {
      "source": "https://www.pptx.gallery",
      "layouts": {
        "chart": {
          "name": "Chart",
          "summary": "One to six charts, with an optional note.",
          "tags": [
            "Visuals"
          ],
          "direction": "column",
          "regions": [
            {
              "name": "title"
            },
            {
              "name": "charts",
              "accepts": [
                "chart",
                "group",
                "diagram"
              ],
              "role": "primary",
              "flow": "grid"
            },
            {
              "name": "note",
              "size": "auto",
              "accepts": [
                "text"
              ],
              "role": "supporting",
              "flow": "none"
            }
          ],
          "description": "Give a chart enough space to show its evidence. Use the title to state the conclusion and labels to explain the measures.",
          "preview": {
            "vectorSrc": "https://www.pptx.gallery/layout-previews/chart.svg"
          }
        }
      }
    }
  }
}
Open in visual editorOpen in Inspector

Load this config in the gallery's visual editor, or in the Inspector at pptx.dev.

Other Diagrams